AIM Documentation | |
Document No | Document Description |
Business Process Architecture (BP) | |
BP.010 | Define Business and Process Strategy |
BP.020 | Catalog and Analyze Potential Changes |
BP.030 | Determine Data Gathering Requirements |
BP.040 | Develop Current Process Model |
BP.050 | Review Leading Practices |
BP.060 | Develop High-Level Process Vision |
BP.070 | Develop High-Level Process Design |
BP.080 | Develop Future Process Model |
BP.090 | Document Business Procedure |
Business Requirements Definition (RD) | |
RD.010 | Identify Current Financial and Operating Structure |
RD.020 | Conduct Current Business Baseline |
RD.030 | Establish Process and Mapping Summary |
RD.040 | Gather Business Volumes and Metrics |
RD.050 | Gather Business Requirements |
RD.060 | Determine Audit and Control Requirements |
RD.070 | Identify Business Availability Requirements |
RD.080 | Identify Reporting and Information Access Requirements |
Business Requirements Mapping | |
BR.010 | Analyze High-Level Gaps |
BR.020 | Prepare mapping environment |
BR.030 | Map Business requirements |
BR.040 | Map Business Data |
BR.050 | Conduct Integration Fit Analysis |
BR.060 | Create Information Model |
BR.070 | Create Reporting Fit Analysis |
BR.080 | Test Business Solutions |
BR.090 | Confirm Integrated Business Solutions |
BR.100 | Define Applications Setup |
BR.110 | Define security Profiles |
Application and Technical Architecture (TA) | |
TA.010 | Define Architecture Requirements and Strategy |
TA.020 | Identify Current Technical Architecture |
TA.030 | Develop Preliminary Conceptual Architecture |
TA.040 | Define Application Architecture |
TA.050 | Define System Availability Strategy |
TA.060 | Define Reporting and Information Access Strategy |
TA.070 | Revise Conceptual Architecture |
TA.080 | Define Application Security Architecture |
TA.090 | Define Application and Database Server Architecture |
TA.100 | Define and Propose Architecture Subsystems |
TA.110 | Define System Capacity Plan |
TA.120 | Define Platform and Network Architecture |
TA.130 | Define Application Deployment Plan |
TA.140 | Assess Performance Risks |
TA.150 | Define System Management Procedures |
Module Design and Build (MD) | |
MD.010 | Define Application Extension Strategy |
MD.020 | Define and estimate application extensions |
MD.030 | Define design standards |
MD.040 | Define Build Standards |
MD.050 | Create Application extensions functional design |
MD.060 | Design Database extensions |
MD.070 | Create Application extensions technical design |
MD.080 | Review functional and Technical designs |
MD.090 | Prepare Development environment |
MD.100 | Create Database extensions |
MD.110 | Create Application extension modules |
MD.120 | Create Installation routines |
Data Conversion (CV) | |
CV.010 | Define data conversion requirements and strategy |
CV.020 | Define Conversion standards |
CV.030 | Prepare conversion environment |
CV.040 | Perform conversion data mapping |
CV.050 | Define manual conversion procedures |
CV.060 | Design conversion programs |
CV.070 | Prepare conversion test plans |
CV.080 | Develop conversion programs |
CV.090 | Perform conversion unit tests |
CV.100 | Perform conversion business objects |
CV.110 | Perform conversion validation tests |
CV.120 | Install conversion programs |
CV.130 | Convert and verify data |
Documentation (DO) | |
DO.010 | Define documentation requirements and strategy |
DO.020 | Define Documentation standards and procedures |
DO.030 | Prepare glossary |
DO.040 | Prepare documentation environment |
DO.050 | Produce documentation prototypes and templates |
DO.060 | Publish user reference manual |
DO.070 | Publish user guide |
DO.080 | Publish technical reference manual |
DO.090 | Publish system management guide |
Business System Testing (TE) | |
TE.010 | Define testing requirements and strategy |
TE.020 | Develop unit test script |
TE.030 | Develop link test script |
TE.040 | Develop system test script |
TE.050 | Develop systems integration test script |
TE.060 | Prepare testing environments |
TE.070 | Perform unit test |
TE.080 | Perform link test |
TE.090 | perform installation test |
TE.100 | Prepare key users for testing |
TE.110 | Perform system test |
TE.120 | Perform systems integration test |
TE.130 | Perform Acceptance test |
PERFORMACE TESTING(PT) | |
PT.010 | Define Performance Testing Strategy |
PT.020 | Identify Performance Test Scenarios |
PT.030 | Identify Performance Test Transaction |
PT.040 | Create Performance Test Scripts |
PT.050 | Design Performance Test Transaction Programs |
PT.060 | Design Performance Test Data |
PT.070 | Design Test Database Load Programs |
PT.080 | Create Performance Test TransactionPrograms |
PT.090 | Create Test Database Load Programs |
PT.100 | Construct Performance Test Database |
PT.110 | Prepare Performance Test Environment |
PT.120 | Execute Performance Test |
Adoption and Learning (AP) | |
AP.010 | Define Executive Project Strategy |
AP.020 | Conduct Initial Project Team Orientation |
AP.030 | Develop Project Team Learning Plan |
AP.040 | Prepare Project Team Learning Environment |
AP.050 | Conduct Project Team Learning Events |
AP.060 | Develop Business Unit Managers’Readiness Plan |
AP.070 | Develop Project Readiness Roadmap |
AP.080 | Develop and Execute CommunicationCampaign |
AP.090 | Develop Managers’ Readiness Plan |
AP.100 | Identify Business Process Impact onOrganization |
AP.110 | Align Human Performance SupportSystems |
AP.120 | Align Information Technology Groups |
AP.130 | Conduct User Learning Needs Analysis |
AP.140 | Develop User Learning Plan |
AP.150 | Develop User Learningware |
AP.160 | Prepare User Learning Environment |
AP.170 | Conduct User Learning Events |
AP.180 | Conduct Effectiveness Assessment |
Production Migration (PM) | |
PM.010 | Define Transition Strategy |
PM.020 | Design Production Support Infrastructure |
PM.030 | Develop Transition and Contingency Plan |
PM.040 | Prepare Production Environment |
PM.050 | Set Up Applications |
PM.060 | Implement Production Support Infrastructure |
PM.070 | Verify Production Readiness |
PM.080 | Begin Production |
PM.090 | Measure System Performance |
PM.100 | Maintain System |
PM.110 | Refine Production System |
PM.120 | Decommission Former Systems |
PM.130 | Propose Future Business Direction |
PM.140 | Propose Future
Technical Direction |
Restrict
!-mybloggersworld.com->!-mbw>
Showing posts with label AIM Documentation in Oracle R12. Show all posts
Showing posts with label AIM Documentation in Oracle R12. Show all posts
Thursday, September 6, 2012
AIM Documentation in Oracle R12
Subscribe to:
Posts (Atom)